New aerobic septic system installs in Waco, TX
A new system is a big job, and it's one you'll live with for years. Here's what goes into one.
What a new install involves
An aerobic treatment unit works a lot like a small version of a town's sewage plant. An air pump pushes oxygen into the treatment tank, which lets bacteria break waste down further than a plain tank can. The cleaner water is disinfected, then spread over the yard by spray heads or drip lines.
Installing one means choosing the right system for the lot and the house, digging, setting the tanks, running the lines, wiring the panel and air pump, and then starting it up and testing it. Have questions before you start? The FAQ page covers the common ones.
The parts of an aerobic system
- Pretreatment (trash) tank
- Catches solids before they reach the aerobic chamber
- Aerobic treatment chamber
- Where air is pumped in and bacteria break down the waste
- Air pump (aerator)
- Supplies the air that keeps the process running
- Clarifier
- Lets remaining solids settle out of the treated water
- Chlorinator
- Disinfects the water before it goes out to the yard
- Pump tank and pump
- Holds treated water and sends it to the spray heads or drip lines
- Control panel and alarm
- Runs the timer and pump, and warns you when something's wrong
- Spray heads or drip lines
- Spread the treated water over the dispersal area
- Risers and lids
- Ground-level access for inspections and service
How the job runs
Every property is different, but the work generally goes in this order.
-
1
Looking at the lot
The soil, the slope, the size of the house and where the system can go on the property.
-
2
Choosing the system
Picking the aerobic unit and whether spray or drip dispersal fits the property.
-
3
Excavation
Digging for the tanks and trenching for the lines.
-
4
Setup
Setting the tanks, connecting the plumbing from the house, installing the air pump, chlorinator, control panel and the spray heads or drip lines.
-
5
Startup and testing
Filling, powering up and running the system to check that the pump, alarm and dispersal all work.
What to expect on your property
Digging in the yard
Tanks and lines go in the ground, so parts of the yard will be dug up while the work is going on.
Access for equipment
Clear a path to the work area and move vehicles, trailers and anything stored nearby.
Kids and pets
Keep them away from open holes and trenches until everything's covered.
Afterward
Lids at ground level, a control panel on the house or a post, and spray heads or drip lines in the dispersal area.
Common questions
How long does an install take?
It depends on the property, the system and the weather. Call and we can talk through your situation.
How torn up will my yard be?
Expect dug-up areas where the tanks and lines go, plus tracks along the path to the work area. The ground gets backfilled, and grass comes back with time and water.
What care does a new aerobic system need?
Keep spray heads clear of grass and brush, keep the chlorinator stocked with calcium hypochlorite tablets labeled for wastewater (never swimming pool tablets), and call when the alarm goes off. New aerobic systems in Texas come with an initial two-year service policy, starting when the system is first used. After that, a maintenance contract keeps the inspections on schedule.
Does a new system need a permit?
Yes. In Texas, building a septic system needs a permit from your local permitting authority. The FAQ page covers who issues permits.
More answers on the FAQ page.
Planning a new system?
Call with the property location and what you're building. We'll talk through what fits.
Or send a service request